Thursday 14 July 2016

13 July 2016 . 11 am . POM Exam

13 July 2016 . 11 am . Wed Principle of Management Exam


ken tan class

multiple choice question

13 July 2016 . 9am . Wed : Economic Exam

13 July 2016 . 9am . Wed : Econ Exam


plot the graph
determinants of demands that would affect buyer decision

10 objectives question

11 June 2016.Site Survey-review on drawing

11 July 2016 Building Tech ; Walls

11 July 2016, 9am, Monday : Building Tech ; Walls

18 July 2016 Quiz

Fill in the blank

Build captivity wall in the future for my house. Thermal Insulation

DPC - Course
cheaper
need very skillful
3 coats with difference direction

DPM - membrane


youtube - watch DPM treatment

nail ( roof nail ) the tile on the roof
buy insurance for house

1 July 2016.Moral Studies Test






















1 July 2016.English : Individual Presentation Session & Assignment Briefting

01 July 2016, 9am, Friday. English : Individual Presentation Session & Assignment Briefting






Speech Structure

1. Introduction
  • the attention getter drew the audience into the speech
  • the speaker stated the topic and why it was important to listen
  • the preview was concise list of the main points
2.Body
  • the speaker flowed well from one main point to the next with help transitions
  • the speaker transitioned to the conclusion smoothly
 3. Conclusion
  •  the summary listed all the main points in the same order as discussed in the body
  • the summary included the important ideas and concepts the speaker wanted the listeners to listners to remember.
  • the final remark left me thinking about the speaker's topic and or brought the speech to full closure
4. Delivery
  • the speaker's movements and posture showed confidence and comfort
  • the speaker's fcial expressions were alive and appeared natural
  • the speaker maintined eye contact with the entire audience
  • the speaker's voice was dynamic, showing enthusiamsm
  • the speaker's spoke extemporaneously ( prepared and practiced but not memorized )
5. Time
  • the speaker spoke in the required time frame

Remark : Can use the slide for presentation.

Writing Structure

Words : 500 words
Font : Times New Roman
Size : 12
Spacing : 1.5
Due Date : by 19 August 2016

29 June 2016.POM

29 June 2016, 11am, Wednesday . Marketing


Kent sharing how to

  1. "touch" the customer by allocate 10% return back to appreciate your client
  2. win your team heart

29 June 2016 Economic : Test

29 June 2016, 900am, Wednesday. Economic : Test


Give the definition
  1. the economic problems of scarify
  2. opportunity cost
  3. concept of macroeconomic and microeconomics
  4. normal goods
  5. inferior goods
  6. complementary goods
  7. substitute goods
  8. determinants of demand and determinant of supply
  9. the law of demand and the law of supply
  10. understand the reasons of the demand curve to start to the right or start to left
  11. understand the equilibrium, surplus and shortage.

27 June .2016.Site Survey- Part 2 Linear Survey







27 June -Joint Assignment of Building Tech and Site Survey


27 June 2016, 900am, Monday. Building Tech and Site Survey Assignment ( due date week 30 )

26 June 2016, 900am, Monday. Building Tech and Site Survey Assignment ( due date week 30 )

when is the week 30th? http://diplomaestatemanagement.blogspot.my/2016/06/important-date.html









" Fire the interior designer if not providing SOP " he sasy

He is Perfectionist :) I will hire him for my Villa construction

"Documented PROPERLY - Correct and sufficient information




Compare KLCC find out the SOP off cut IOI mall vivahome Pavillion

See how the tiling started and finished















27 June 2016.Building Tech 1-Chapter 5 : Foundation

26 June 2016, 900am, Monday. Building Tech Chapter 5 : Foundation














Wind, Rain, Snow  = Dynamic Load





Foundation = Piling + Footing




Settle equally and constantly if not we call it distress.



















Rock
Gravel
Sand
Sillt  æ·¤æ³¥  sand, soil, mud, etc., that is carried by flowing water and that sinks to the bottom of a river, pond
Clay

Mixture among the 5 categories is allowed.


Foundation cost more than 50% of the cost of high rise buiding






Food Grade Copper Pipe






additional water discharge channel in the retaining wall . If not the retaining wall will fail and collapes










Which one is strip footing and pad footing?





Which is more cost effective? Strip or Pad Foundation?










Middle east - using raft foundation . They need the building to float on the sand

Increase the surface friction by increasing number of pile